Project Summary

In summer 2026, I was a Stanback fellow with The Nature Conservancy. Working with Luke Pangle, I led a project aiming to quantify sediment deposits from a landslide caused by Hurricane Helene on the South Toe River near Asheville. Throughout the summer, I completed a GIS analysis on the debris flow, estimating that nearly 30,000 metric tons of material had mobilized off the slope. I helped with sensor installation as shown above. We installed one turbidity sensor and one auto sampler at each of our study sites, which were located upstream and downstream of the debris flow. I completed suspended sediment concentration analysis on water samples collected by the auto samplers and plotted the data against the turbidity data we collected with the EXO Sondes. While we didn't have any conclusive findings at the end of the summer, I am happy to say that I am continuing work on this project as my capstone for the Master of Environmental Management program at Duke University.

My final presentation from this summer is linked below.

Project information

  • Category Environmental research
  • Organization The Nature Conservancy
  • Date Summer 2026